Things are happening crazy fast right now. We decided on interior and exterior paint colors. The interior has been painted. Doors are in (including all 5 garage doors [one's in the back] and openers, though we have a temporary front door until ours comes in. Cabinets are nearly all in. There was a problem with the cabinets for the island, but that will be fixed soon. The septic system is being installed today. Power lines are up and we should have power soon. The propane tank will be installed tomorrow. The electrical will be done next week. We ordered all of our flooring and tile today. It will be installed beginning Monday. Last night we ordered the last of the lighting and the kitchen faucets on-line. The stonework will begin any time. As soon as the roofers put trim on the exterior will be painted.
The next decision is the garbage disposal. I also need to lay out the cabinet for the powder room so that we know what size the granite needs to be cut and where the sink drain hole needs to go. As soon as the island is done they make the template for the counter tops to get started on those.
We are getting quotes on the circle driveway and walk. We think we are going to have the walkway done with flagstone instead of the pavers that we had originally planned. It will go better with the stonework and the flagstone by the viga poles.

Labels: , ,

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home